    "id": 11073,
    "slug": "boilers-act-1923",
    "title": "The Boilers Act, 1923",
    "short_title": "The Boilers Act, 1923",
    "act_number": "(5 of 1923)",
    "act_year": 1923,
    "act_type": "CENTRAL",
    "location": "India (Central)",
    "law_status": "unknown",
    "enactment_date": null,
    "description": "The Boilers Act, 1923",
    "preamble": "",
    "section_label": "Section",
    "sections": [
        {
            "number": "1",
            "title": "1. Short title, extent and commencement.",
            "chapter": null,
            "content": "Object & Reasons▼\nStatement Of Objects And Reasons. -\nGazette of India. 1922, Part V. page 249.-\nStatements of Objects and Reasons - Amendment Act 38 of 1951.\n- Gazette. of India., 24-2-1951, Part. II. Section. 2, page. 76. -\nStatements of Objects and Reasons - Amendment Act 18 of 1960 -\nGazette. of India., 10.3.1960, Part II, Section 2, Ext., page 129.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 0
        },
        {
            "number": "2",
            "title": "2. Definitions.",
            "chapter": null,
            "content": "[(a) \"accident\" means an explosion of boiler, or boiler component, which is calculated to weaken the strength or an uncontrolled release of water or steam therefrom, liable to cause death or injury to any person or damage to any property;]\n[(aa) \"Board\" means the Central Boilers Board constituted under section 27-A;]\n[(b) \"boiler\" means a pressure vessel in which steam is generated for use external to itself by application of heat which is wholly or partly under pressure when steam is shut off but does not include a pressure vessel, -\n(i) with capacity less than 25 litres (such capacity being measured from the feed check valve to the main steam stop valve);\n(ii) with less than one kilogram per centimetre square design gauge pressure and working gauge pressure; or\n(iii) in which water is heated below one hundred degrees centi grade;\n(ba) \"boiler component\" means steam piping, feed piping, economiser, superheater, any mounting or other fitting and any other external or internal part of a boiler which is subject to pressure exceeding one kilogram per centimetre square gauge;]\n[(c) \"Chief Inspector\" , \"Deputy Chief Inspector\" and \"Inspector\" mean, respectively, a person appointed to be a Chief Inspector, a Deputy Chief Inspector and an Inspector under this Act;]\n[(ca) \"Competent Authority\" means an institution recognised in such man ner as may be prescribed by regulations for issue of certificate to the welders for welding of boiler and boiler components;\n(cb) \"Competent Person\" means a person recognised in such manner as may be prescribed by regulations for inspection and certification of boilers and boiler components during manufacture, erection and use. All Inspectors shall be ipso facto competent persons;]\n[(cc) \"economiser\" means any part of a feed-pipe that is wholly or partially exposed to the action of flue gases for the purpose of recovery of waste heat;\n(ccc) \"feed-pipe\" means any pipe or connected fitting wholly or partly under pressure through [which] feed water passes directly to a boiler and which does not form an integral part thereof;]\n[(ccd) \"Inspecting Authority\" means an institution recognised in such manner as may be prescribed by regulations for the inspection and certification of boilers and boiler components during manufacture. All Chief Inspectors of Boilers shall be ipso facto Inspecting Authorities;\n(cce) \"manufacture\" means manufacture, construction and fabrication of boiler or boiler component, or both;\n(ccf) \"manufacturer\" means a person engaged in the manufacture;]\n(d) \"owner\" [includes any person possessing or] using a boiler as agent of the owner thereof and any person using a boiler which he has hired or obtained on loan from the owner thereof;\n(e) \"prescribed\" means prescribed by regulations or rules made under this Act;\n[(f) \"steam pipe\" means any pipe through which steam passes if -\n(i) the pressure at which steam passes through such pipe exceeds 3.5. kilogram per square centimetres above atmospheric pressure, or\n(ii) such pipe exceeds 254 millimetres in internal diameter and the pressure of steam exceeds 1 kilogram per square centimetres above the atmospheric pressure, and includes in either case any connected fitting of a steam-pipe;]\n[(g) \"structural alteration, addition or renewal\" means, -\n(i) any change in the design of a boiler or boiler component;\n(ii) replacement of any part of boiler or boiler component by a part which does not conform to the same specification; or\n(iii) any addition to any part of a boiler or boiler component;\n(h) \"superheater\" means any equipment which is partly or wholly exposed to flue gases for the purpose of raising the temperature of steam beyond the saturation temperature at that pressure and includes a re-heater;\n(i) \"Technical Adviser\" means the Technical Adviser appointed under sub-section (1) of section 4-A.]\n[2-A. Application of Act to feed-pipes.\n[2-B. Application of Act to economisers.\n[3. Limitation of application.\n(a) locomotive boilers belonging to or under the control of the railways;\n(b) any boiler or boiler component, -\n(i) in any vessel propelled wholly or in part by the agency of steam;\n(ii) belonging to, or under the control of, the Army, Navy or Air Force; or\n(iii) appertaining to a sterilizer disinfector used in hospitals or nursing homes, if the boiler does not exceed one hundred litres in capacity.]",
            "footnote": "",
            "is_definition": true,
            "sort_order": 1
        },
        {
            "number": "4",
            "title": "4. Power to limit extent.",
            "chapter": null,
            "content": "[4-A. Technical Adviser.\n[4-B. Welders certificate.\n4-C. Conditions precedent for manufacture of boiler and boiler component.\n(a) he has provided in the premises or precincts wherein such boiler or boiler component, or both are manufactured, such facilities for design and construction as may be prescribed by regulations;\n(b) the design and drawings of the boiler and boiler component have been approved by the Inspecting Authority under clause (a) of sub-section (2) of section 4-D;\n(c) the materials, mounting and fittings used in the construction of such boiler or boiler component, or both conform to the specifications prescribed by regulations; and\n(d) the persons engaged for welding boiler or boiler component hold Welders certificate issued by a Competent Authority.\n4-D. Inspection during manufacture.\n(a) satisfied that the boiler or the boiler component conforms to the standards prescribed by regulations, it shall issue a certificate of inspection and stamp the boiler, or boiler component, or both; or\n(b) of the opinion that the boiler, or boiler component, or both does not conform to the standards prescribed by regulations, it may for reasons to be recorded in writing refuse to issue such certificate:\n4-E. Inspection during erection.\n(a) satisfied that the erection of the boiler is in accordance with the regulations, it shall issue a certificate of inspection in such form as may be prescribed by regulations; or\n(b) of the opinion that the boiler has not been erected in accordance with the regulations, it may for reasons to be recorded in writing, refuse to grant the certificate and shall communicate such refusal to the manufacturer of the boiler or boiler component forthwith:\n4-F. Conditions precedent for repairing boiler and boiler component.\n(a) he has provided in the premises or precincts, where in such boiler or boiler component or both are being used, such facilities for repairs as may be prescribed by regulations;\n(b) the design and drawings of the boiler or boiler component, as the case may be, and the materials, mountings and fittings used in the repair of such boiler or boiler component conform to the regulations;\n(c) persons engaged in welding, holds a Welders certificate issued by a Competent Authority;\n(d) every user who does not have the in-house facilities for repair of boiler or boiler component shall engage a Boiler Repairer possessing a Boiler Repairer certificate for repair of a boiler or boiler component or both, as the case may be;\n(e) every user shall engage a Competent Person for approval of repairs to be carried out in-house or by the repairers. ]\n[5. Chief Inspector, Deputy Chief Inspectors and Inspectors.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 2
        },
        {
            "number": "6",
            "title": "6. Prohibition of use of unregistered or uncertificated boiler.",
            "chapter": null,
            "content": "(a) unless it has been registered in accordance with the provisions of this Act;\n(b) in the case of any boiler which has been transferred from one State to another, until the transfer has been reported in the prescribed manner;\n(c) unless a certificate or provisional order authorising the use of the boiler is for the time being in force under this Act;\n(d) at a pressure higher than the maximum pressure recorded in such certificate or provisional order;\n(e) where the [Central Government] has made rules requiring that boilers shall be in charge of persons holding [certificates of proficiency or competency,] unless the boiler is in charge of a person holding the certificate required by such rules:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 3
        },
        {
            "number": "7",
            "title": "7. Registration.",
            "chapter": null,
            "content": "(a) register the boiler and assign a register number thereto either forthwith or after satisfying himself that any structural alteration, addition or renewal which he may deem necessary has been made in or to the boiler or any steam-pipe attached thereto, or\n(b) refuse to register the boiler:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 4
        },
        {
            "number": "8",
            "title": "8. Renewal of certificate.",
            "chapter": null,
            "content": "(a) on the expiry of the period for which it was granted; or\n(b) when any accident occurs to the boiler; or\n(c) when the boiler is moved, the boiler not being a vertical boiler the heating surface of which is less than [ [20] square metres,] or a portable or vehicular boiler; or\n[(d) save as provided in section 12, when any structural alteration, addition or renewal is made in or to the boiler;]\n(e) if the Chief Inspector in any particular case so directs, when any structural alteration, addition or renewal is made in or to any steam-pipe attached to the boiler; or\n(f) on the communication to the owner of the boiler of an order of the Chief Inspector or Inspector prohibiting its use on the ground that [it or any boiler component] attached thereto is in a dangerous condition.\n(a) satisfied that the boiler and the boiler components attached thereto are in good condition he shall issue a certificate for such period as may be prescribed by regulations.\n(b) of the opinion that the boiler or boiler component, or both does not conform to the standards prescribed by regulations, it may, for reasons to be recorded in writing, refuse to issue such certificate:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 5
        },
        {
            "number": "9",
            "title": "9. Provisional orders.",
            "chapter": null,
            "content": "(a) on the expiry of six months from the date on which it is granted, or\n(b) on receipt of the orders of the Chief Inspector, or\n(c) in any of the cases referred to in clauses (b) , (c), (d), (e) and (f) of sub-section (1) of section 8, and on so ceasing to be in force shall be surrendered to the Inspector.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 6
        },
        {
            "number": "10",
            "title": "10. Use of boiler pending grant of certificate.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 7
        },
        {
            "number": "11",
            "title": "11. Revocation of certificate or provisional order.",
            "chapter": null,
            "content": "(a) if there is reason to believe that the certificate or provisional order has been fraudulently obtained or has been granted erroneously or without sufficient examination; or\n(b) if the boiler in respect of which it has been granted has sustained injury or has ceased to be in good condition; or\n(c) where the [Central Government] has made rules requiring that boilers shall be in charge of persons holding [certificates of proficiency or competency,] if the boiler is in charge of a person not holding the certificate required by such rules; or\n[* * *]",
            "footnote": "",
            "is_definition": false,
            "sort_order": 8
        },
        {
            "number": "12",
            "title": "12. Alterations and renewals to boilers.",
            "chapter": null,
            "content": "[13. Alteration or renewal of boiler component.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 9
        },
        {
            "number": "14",
            "title": "14. Duty of owner at examination.",
            "chapter": null,
            "content": "(a) to afford to the [Competent Person] all reasonable facilities for the examination and all such information as may reasonably be required of him,;\n(b) to have the boiler properly prepared and ready for examination in the [manner prescribed by regulations] ; and\n(c) in the case of an application for the registration of a boiler, to provide such drawings, specifications, certificates and other particulars as may [be prescribed by regulations.]",
            "footnote": "",
            "is_definition": false,
            "sort_order": 10
        },
        {
            "number": "15",
            "title": "15. Production of certificates, etc.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 11
        },
        {
            "number": "16",
            "title": "16. Transfer of certificates, etc.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 12
        },
        {
            "number": "17",
            "title": "17. Powers of entry.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 13
        },
        {
            "number": "18",
            "title": "18. Report of accidents.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 14
        },
        {
            "number": "19",
            "title": "19. Appeals to Chief Inspector.",
            "chapter": null,
            "content": "(a) an order made or purporting to be made by an Inspector in the exercise of any power conferred by or under this Act, or\n(b) a refusal of an Inspector to make any order or to issue any certificate which he is required or enabled by or under this Act to make or issue, may, within thirty days from the date on which such order or refusal is communicated to him, appeal against the order or refusal to the Chief Inspector.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 15
        },
        {
            "number": "20",
            "title": "20. Appeals to appellate authority.",
            "chapter": null,
            "content": "(a) refusing to register a boiler or to grant or renew a certificate in respect of a boiler; or\n(b) refusing to grant a certificate having validity for the full period applied for; or\n(c) refusing to grant a certificate authorising the use of a boiler at the maximum pressure desired; or\n(d) withdrawing or revoking a certificate or provisional order; or\n(e) reducing the amount of pressure specified in any certificate or the period for which such certificate has been granted; or\n(f)ordering any structural alteration, addition or renewal to be made in or to a boiler or steam-pipe, or refusing sanction to the making of any structural alteration, addition or renewal in or to a boiler, may, within thirty days of the communication to him of such order, [prefer an appeal to the Central Government.]\n[20-A. Power of Central Government to revise order of appellate authority.\n[21. Finality of orders.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 16
        },
        {
            "number": "22",
            "title": "22. Minor penalties.",
            "chapter": null,
            "content": "(i) to surrender a provisional order as required by section 9, or\n(ii) to produce a certificate or provisional order when duly called upon to do so under section 15, or\n(iii) to make over to the new owner of a boiler a certificate or provisional order as required by section 16, shall be punishable with fine which may extend to [five thousand rupees]",
            "footnote": "",
            "is_definition": false,
            "sort_order": 17
        },
        {
            "number": "23",
            "title": "23. Penalties for illegal use of boiler.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 18
        },
        {
            "number": "24",
            "title": "24. Other penalties.",
            "chapter": null,
            "content": "(a) uses or permits to be used a boiler of which he is the owner and which has been transferred from one State to another without such transfer having been reported as required by section 6, or\n(b) being the owner of a boiler fails to cause the registered number allotted to the boiler under this Act to be marked on the boiler as required by sub-section (6) of section 7, or\n(c) makes any structural alteration, addition or renewal in or to a boiler without first obtaining the sanction of the Chief Inspector when so required by section 12, or to a steam-pipe without first informing the Chief Inspector, when so required by section 13, or\n(d) fails to report an accident to a boiler or steam-pipe when so required by section 18, or\n(e) tempers with a safety valve of a boiler so as to render inoperative at the maximum pressure at which the use of the boiler is authorised under this Act, [or]\n[(f) allows another person to go inside a boiler without effectively disconnecting the same in the prescribed manner from any steam or hot water connection with any other boiler or from fuel mains,] , shall be [punishable with imprisonment which may extend to two years or with fine which may extend to one lakh rupees, or with both.]",
            "footnote": "",
            "is_definition": false,
            "sort_order": 19
        },
        {
            "number": "25",
            "title": "25. Penalty for tampering with register mark.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 20
        },
        {
            "number": "26",
            "title": "26. Limitation and previous sanction for prosecutions.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 21
        },
        {
            "number": "27",
            "title": "27. Trial of offences.",
            "chapter": null,
            "content": "[27-A. Central Boilers Board.\n(a) the Secretary to the Government of India incharge of the Department of the Central Government having administrative control of the Board who shall be the Chairperson ex officio ;\n(b) a senior technical officer conversant with the inspection and examina tion of boilers, to be nominated by the Government of each State (other than a Union territory);\n(c) equal number of other persons as in sub-section (b) above to represent -\n(i) Central Government,\n(ii) the Bureau of Indian Standards,\n(iii) boiler and boiler component manufacturers,\n(iv) National laboratories,\n(v) engineering consultancy agencies,\n(vi) users of boilers, and\n(vii) such other interests which in the opinion of the Central Government ought to be represented on the Board, to be nominated by the Central Government;\n(d) Technical Adviser, Member-Secretary ex officio .",
            "footnote": "",
            "is_definition": false,
            "sort_order": 22
        },
        {
            "number": "28",
            "title": "28. Power to make regulations.",
            "chapter": null,
            "content": "[(a) for laying down the standard conditions in respect of material, design, construction, erection, operation and maintenance which shall be required for the purposes of enabling the registration and certification of boilers, boiler components, boiler mountings and fittings under this Act;]\n[(aa) for prescribing the circumstances in which, the extent to which, and the conditions subject to which variation from the standard conditions laid down under clause (a) may be permitted;]\n(b) for prescribing the method of determining the maximum pressure at which a boiler may be used;\n(c) for regulating the registration of boilers, prescribing the fees payable therefor [and for the inspection and examination of boilers or parts thereof,] the drawings, specifications certificates and particulars to be produced by the owner, the method of preparing a boiler for examination, the form of the Inspector 's report thereon, the method of marking the register number, and the period within which such number is to be marked on the boiler;\n(d) for regulating the inspection and examination of boilers and [boiler components, boiler mountings and fittings,] and prescribing forms of certificates therefor;\n(e) for ensuring the safety of persons working inside a boiler; and\n[(ea) for prescribing the qualifications and experience subject to which the Inspecting Authorities, Competent Authorities and Competent Persons shall be recognised under this Act;\n(eb) the conditions subject to which and the manner in which manufacturer of boiler components or material may be recognised;\n(ec) facilities for design and construction which are required to be provided in the premises in which the manufacturing of any boiler or boiler component is carried out;\n(ed) fee for the purposes of inspection or grant of recognition or any certificate under this Act;\n(ef) procedure for examination and grant of Welders certificate;\n(eg) powers and functions which the Board may delegate to the Technical Adviser;\n(eh) documents to be enclosed along with the application for registration of boilers or renewal of a certificate authorising the use of boilers;\n(ei) the manner of inspection of boilers;\n(ej) the period for which a certificate authorising the use of a boiler may be renewed;\n(ek) the conditions subject to which and the form in which Competent Person shall renew a certificate authorising the use of boilers;\n(el) the manner and the form in which a Repairer 's certificate shall be issued;\n(em) the manner in which the boiler shall be prepared for examination;\n(en) drawings, specification, documents and other particulars which owner of a boiler is required to make available to the Competent Person;\n(eo) the manner in which a person may be authorised to conduct energy audit and the manner in which such audit shall be conducted;\n(ep) the manner in which disputes between the States with respect to registration of boilers shall be resolved;]\n(f)for providing for any other matter which is not, in the opinion of the [Board] , a matter of merely local or State importance.\n[28-A. Power of Central Government to make rules.\n(a) the procedure to be followed in making applications under section 20-A and the fees payable in respect of such application;\n(b) the qualifications and experience of persons to be appointed as Chief Inspectors, Deputy Chief Inspectors and Inspectors;\n(c) the manner in which appeals may be preferred to the Board, the fees payable in respect of appeals and the procedure to be followed of disposing such appeals;\n(d) the term of office of the members and the manner in which they shall be nominated under clauses (b) and (c) of sub-section (2) of section 27-A;\n(e) the qualifications and experience of the Technical Adviser;\n(f)for requiring boilers to be under the charge of persons holding certificate of proficiency or competency and for prescribing the conditions on which such certificate may be granted;\n(g) the manner in which and the person who shall conduct inquiry into the accident.]",
            "footnote": "",
            "is_definition": false,
            "sort_order": 23
        },
        {
            "number": "29",
            "title": "29. Power to make rules.",
            "chapter": null,
            "content": "[(a) the powers and duties of the Chief Inspector, Deputy Chief Inspectors and Inspectors;]\n(b) for regulating the transfer of boilers;\n(c) for providing for the registration and certification of boilers in accordance with the regulations made under this Act;\n[* * *]\n(e) for prescribing the times within which Inspectors shall be required to examine boilers under section 7 or section 8;\n[ (f) fee payable for registration of boilers;]\n(g) for regulating inquiries into accidents;\n[(h) the manner in which appeals shall be preferred to the Chief Inspector and the procedure to be followed for hearing such appeals;]\n(i) for determining the mode of disposal of fees, costs and penalties levied under this Act; and [* * *]\n[* * *]",
            "footnote": "",
            "is_definition": false,
            "sort_order": 24
        },
        {
            "number": "30",
            "title": "30. Penalty for breach of rules.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 25
        },
        {
            "number": "31",
            "title": "31. Publication of regulations and rules.",
            "chapter": null,
            "content": "[31-A. Power of Central Government to give directions.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 26
        },
        {
            "number": "32",
            "title": "32. Recovery of fees, etc.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 27
        },
        {
            "number": "33",
            "title": "33. Applicability to the Government.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 28
        },
        {
            "number": "34",
            "title": "34. Exemptions.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 29
        },
        {
            "number": "35",
            "title": "35. Repeal of enactments.",
            "chapter": null,
            "content": "THE SCHEDULE",
            "footnote": "",
            "is_definition": false,
            "sort_order": 30
        }
    ],
    "metadata": {
        "Act ID": "Last Updated 30th December, 2019 [act316]",
        "Act Number": "(5 of 1923)",
        "Enactment Date": "",
        "Act Year": "1923",
        "Short Title": "The Boilers Act, 1923",
        "Type": "CENTRAL",
        "Location": "India (Central)"
    },
    "updated_at": "2026-09-29 21:52:21"
}