{
    "act_title": "Bihar Coal Mining Area Development Authority Rules, 1988",
    "act_slug": "bihar-coal-mining-area-development-authority-rules-1988-1988",
    "section_label": "Section",
    "section": {
        "number": "129",
        "title": "129. Power of Authority to require the cost to be deposited in advance.",
        "chapter": null,
        "content": "Appendix 1 Form of Application Under Section 48A of the Act and Rules 40 To\nAppendix 1\nForm of Application Under Section 48A of the Act and Rules 40\n(1) Key plan.\n(2) Site Plan.\n(3) Building Plan.\n(4) Front and side elevations and other necessary vertical sections alongwith stair case.\n(5) Service Plans.\n(6) Lay out Plan.\n(7) Specification.\n(8) Complete address of the plot/building.\n(9) Evidence of right over the land-\n(i) Copy of deed.\n(ii) Copy of mutation.\n(iii) Land Rent Receipt.\n(10) Receipt for payment of fee.\n(11) Map showing the details of removal of drainage or change in its structure and basic repair.\n(12) Map showing the area of excavation of earth/removal of stones.\nAddress of the Applicant-\nSignature of the applicant\nName of the applicant (In Block letters)\nAppendix 2\nAppendix 2\nScale of fees for supply of maps under Rule 41\nSI. No.\nSize of Map\nFee for Map\n1\n2\n3\nAppendix 3\nAppendix 3\nForm Prescribed under Section 94 of the Coal Mining Area Development Authority Act, 1986\nAmount of contribution payable to the C.M.A.D.A.\n\t\t\t\tat the rate of 1.5 per cent of the total collection\nName of Municipality/ Notified Area Committee\n\t\t\t\tReturn for quarter ending...\nAmount collected during the quarter ending on....\nArrear\nCurrent\nTotal\nAmount paid against the payable amount\nOutstanding amount (not Paid)\nRemarks\n1\n2\n3\n4\n5\n6\n7\nAppendix 4\nAppendix 4\nCoal Mining Area Development Authority\nCoal Mining Area Development Authority\nDhanbad\nForm No.\nForm No.\nManaging Director/Authorised Officer, Coal Mining Area Development Authority, Dhanbad.\nAppendix 5\nAppendix 5\nCoal Mining Area Development Authority, Dhanbad\nCoal Mining Area Development Authority, Dhanbad\nReturn for Despatches Coal and Coke Royalty Cess.\nDistrict (in which the property lies)\nPost Office\nName of Mine owner\nQuantity of Coal despatched during calendar year\nQuantity of Coal despatched during the calender\n\t\t\t\tyear\n1\n2\n3\n4\n5\nParticulars of Royalty\nParticulars of Royalty\nName and address of Royalty Receiver\nRate per tonne on Coal and Coke\nArrears of Royalty due to\nRoyalty payable for the  year\nRoyalty actually paid in\nDate of Payment\nBalance due at the close of the year\nRemarks\nArrear\nCurrent\n1\n2\n3\n4\n5\n6\n7\n8\n9\nMinor owner ................................. Signature of the Authorised Agent Occupier.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 128
    },
    "prev_section": "128",
    "next_section": "1"
}