{
    "id": 14609,
    "slug": "andhra-pradesh-municipalities-development-control-rules-2008",
    "title": "Andhra Pradesh Municipalities Development Control Rules, 2008",
    "short_title": "Andhra Pradesh Municipalities Development Control Rules, 2008",
    "act_number": "Published vide Notification No. G.O.Ms. No. 569, M",
    "act_year": 2008,
    "act_type": "STATE",
    "location": "Andhra Pradesh",
    "law_status": "unknown",
    "enactment_date": null,
    "description": "Andhra Pradesh Municipalities Development Control Rules, 2008",
    "preamble": "",
    "section_label": "Section",
    "sections": [
        {
            "number": "1",
            "title": "1. Short Title, Applicability & Commencement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 0
        },
        {
            "number": "2",
            "title": "2. Definitions.",
            "chapter": null,
            "content": "(i) \"Competent Authority\" means the Director of Town & Country Planning,\n(ii) \"Enforcement Authority\" means the Commissioner of the Municipality/ Nagar Panchayath or the Executive Authority of a Special Unit created for the purpose of monitoring and enforcement of building and development activity.\n(iii) \"Height of building\" means height measured from the abutting road and in case of undulated terrain height can be considered as average of the corresponding ground level or formation level of proposed site.\n(iv) \"High-Rise building\" means a building 18 meters or more in height. However, chimneys, cooling towers, boiler rooms/ lift machine rooms, cold storage and other non-working areas in case of industrial buildings and water tanks and architectural features in respect of other buildings may be permitted as a non- High Rise building. Buildings less than 18 m including stilt floor/parking floor stand excluded from the definition of high-rise buildings.\n(v) \"Parking Complex/Parking Lot\" means premises either built or open which is utilized purely for parking of vehicles and where parking fees is collected by the owner and permitted in specific areas. The minimum site shall be 500 sq.meters\n(vi) \"Sanctioning Authority\" means the Commissioner of the Municipality or a Special Unit created for the purpose of sanctioning and monitoring building and development activity.\n(vii) \"Transferable Development Right\" (TDR) means an award specifying the built up area an owner of a site or plot can sell or dispose or utilize elsewhere, whose site or plot is required to be set apart or affected for a community amenity or development for public purpose in the Master Plan/statutory plan or in road widening or covered in recreational use zone, etc.. The award would be in the form of a TDR Certificate issued by the Competent Authority, only after such lands vest with Local authority.\n3.",
            "footnote": "",
            "is_definition": true,
            "sort_order": 1
        },
        {
            "number": "4",
            "title": "4. Restriction on Minimum Building Plot Size along abutting roads in new developments and layouts.",
            "chapter": null,
            "content": "Table - I\nTable - I\nAbutting road Right-of-way (in Meters)\nAbutting road Right-of-way (in Meters)\nMinimum plot size allowed (in sq. m)\nMinimum plot size allowed (in sq. m)\nMax. Plot size allowed (in sq m)\nMax. Plot size allowed (in sq m)\n9 and below 12\n12 and below 18\n18 and below 30\n30 and above\n100\n200\n300\n400\n2000\nNo Restriction\nNo Restriction\nNo Restriction\n* Road Right-of-way means the total land width reserved for the road in the layout/Master Plan / Development Plan / Development Scheme whether the road is developed/formed or otherwise and includes the service road, if any, to be provided.\n* Further in all such new approved layouts, the minimum width of roads other than culde-sac shall be 12 meters(40ft)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 2
        },
        {
            "number": "5",
            "title": "5. Restrictions of building activity in vicinity of certain areas.",
            "chapter": null,
            "content": "(b) The above water bodies and courses shall be maintained as recreational/Green buffer zone and no building activity other than recreational use shall be carried out within:\n(i) The Coastal Regulation Zone (CRZ) restricted area in case of areas along the sea coast.\n(ii) 100 meters from the River edge outside Municipal limits and 50 meters within Municipal limits. No permanent constructions/structures will be permitted within the above-mentioned buffer zone.\n(iii) 30 meters from the boundary of Lakes of area 10 Hectares and above;\n(iv) 9 meters from the boundary of lakes of area less than 10 Hectares / kuntas/shikam lands;\n(v) 9 meters from the boundaries of Canal, Vagu, etc.\n(vi) 2 meters from the defined boundary of Nalas, storm water drains etc. Unless and otherwise stated, the area and the Full Tank Level (FTL) of a lake/ kunta shall be reckoned as measured or given in the Survey of India topographical maps/Irrigation Dept. records.\n(c) Unless and otherwise specified in the Master Plan / Zonal Development Plan,\n•   The 9 metre buffer along the canal/ vagu may be developed as Green Buffer/recreational and /or utilised for road of minimum 9 meters width, wherever feasible.\n•   In case of (b) (iii) above, in addition to development of recreational/green belt along the foreshores of lake, a ring road or promenade of minimum 12 meters may be developed, wherever feasible; while in respect of foreshores of River a river drive road of minimum 18 meters may be developed in the said 30 meters buffer zone.\n•   The above greenery/landscaping and development shall conform to the guidelines and provisions of the National Building Code of India, 2005.\n•   The above buffer zone to be left at (b) and (c) above may be reckoned as part of the building setback.\n(d) For Building activity within the restricted zone near the airport or within 500 meters distance from the boundary of Defence areas / Military establishments, necessary clearance from the concerned Airport Authority / Defence Authority / shall be obtained. For sites located within the Air Funnel zone, prior clearance from the Airport Authority shall be obtained.\n(e) In case of sites in vicinity of High Tension Electricity transmission lines besides taking other safety precautions, a minimum safety distance (both vertical and horizontal) of 3 meters shall be maintained between the buildings and the High Tension electricity lines and 1.5 meters for Low Tension Electricity lines.\n(f) In case of sites in the vicinity of oil /gas pipelines, clear distance and other stipulations of the respective authority shall be complied with.\n(g) Distance shall be maintained between Railway boundary and building line in accordance with Railway Manual.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 3
        },
        {
            "number": "6",
            "title": "6. Requirements of Approach Road For Building Sites / Plots.",
            "chapter": null,
            "content": "TABLE - II\nTABLE - II\nType/ Use of Building plot permissible\nType/ Use of Building plot permissible\nMinimum abutting road width required (in\n\t\t\t\tmeters)\nMinimum abutting road width required (in\n\t\t\t\tmeters)\n(A) Sites In Old/existing Built-Up Areas/congested\n\t\t\t\tAreas/settlement (Gram Khantam/ABADI) (as listed in Annexure I)\n* Residential Buildings - maximum permissible upto 10 meters\n\t\t\t\theight\n* Non-residential buildings and mixed occupancies - maximum\n\t\t\t\tpermissible up to 12 meters height\n6\n(B) Sites In New Areas/ Approved Layout Areas The type of\n\t\t\t\tbuildings & intensity of development shall be w.r.t. the\n\t\t\t\tabutting road width, viz.,\nB 1\nNon-High Rise Residential Buildings including\n\t\t\t\tApartment Complexes; Buildings with shopping on GF and residences\n\t\t\t\ton upper floor; Basic level social amenities like Nursery School\n\t\t\t\t/ Religious Place / Public Health Center / Dispensary /\n\t\t\t\tDiagnostic Laboratory/ Police outpost/Post Office/ Neighbourhood\n\t\t\t\tLibrary cum Community Center and all buildings up to 15 meters\n\t\t\t\theight\n9\nB 2\nIn addition to B 1\n\t\t\t\tabove, High Rise Building/ Complex of height above 18 meters and\n\t\t\t\tup to 24 meters; Group Housing Scheme; Primary School, Middle\n\t\t\t\tschool / Tutorial institution / General Industry / Godown /\n\t\t\t\tPetrol/diesel Filling station; High School, Junior College /\n\t\t\t\tCommercial Complex, Computer units/ Office Building, ITES\n\t\t\t\tComplex, Nursing Home / Community Hall / Function/Marriage Hall /\n\t\t\t\tAssembly Hall/Cinema Theater; Service establishment/ Workshop;\nOthers not specified in the Table and all non\n\t\t\t\thigh-rise buildings up to 18 meters height\n12\nB 3\nIn addition to B 1 & B 2 above, High Rise\n\t\t\t\tbuildings above 24 meters and up to 30 meters height; General\n\t\t\t\tDegree and other non-professional College / Polytechnic, ITI;\n\t\t\t\tProfessional College Campus; Multiplex Complexes, Shopping Malls,\n\t\t\t\tHospitals and all non high-rise buildings up to 18 meters height\n18\nB 4\nIn addition to B 1 to B 3 above, High Rise\n\t\t\t\tBuildings above 30 meters height\n24\n•   The sites in old/existing built-up areas/congested areas/settlement (Gram Khantam/Abadi) shall be as notified by the Local bodies in consultation with the Competent Authority including list of areas prohibited for High-rise buildings.\n•   In case of single plot sub-division approved by the sanctioning authority, a means of access of minimum 3.6 meters pathway may be considered for individual residential building and 6 meters for Apartment Complexes / Commercial Complexes and other non-high rise buildings.\n(i) Where the existing road is less than 6 meters, building in the site would be allowed after setting back 4.5 meters from the center line of such existing road and after leaving the front setback.\n(ii) In case of existing buildings approved prior to these Rules, further additions of floors on the earlier permitted building may be considered either as per these rules or the then rules in force in respect of setbacks, whichever the applicant opts for. This will not apply for building extensions or redevelopment ventures in such sites.\n(iii) Building line is from the edge of the Road Right-of-way (whether existing or proposed). In individual plots where a plot abuts two or more roads, the setbacks shall be as per the building line for the road having maximum width\n(iv) All buildings shall be constructed in conformity with the zoning regulations.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 4
        },
        {
            "number": "7",
            "title": "7. Permissible Height & Setback Requirements.",
            "chapter": null,
            "content": "(i) The permissible coverage would be as per the minimum setbacks to be left within the given site. The minimum setbacks and permissible height would be as per Table - III given below and shall be permissible subject to the following conditions:\n(a) Buildings of height above 15 meters and below 18 meters in Sl. No. 8 of Table - III, shall be permitted only if such plots abut roads of 12 meters minimum width.\n(b) Stilt parking floor permissible is exclusive of height of building up to 15 meters. Height of stilt floor shall not exceed 2.75 meters. In case of non-residential occupancies on sites below 750 sq. meters, for parking a semi-basement of 3 meters height and with such height not exceeding 1.5 meters above ground level may be considered. In case of parking floors where mechanical system and lift are provided, height of such parking floor upto 4.0 meters could be considered.\n(c) Wherever cellars/sub-basements are permissible, these are excluded from height of Building\n(d) No Balcony projection shall be allowed to extend on to the minimum setbacks.\nThese if provided, shall be within the minimum setback required to be left. However, a portico without access to the top may be considered in the front open space.\n(e) In case of Sl. Nos. 4 to 8 of Table - III, stepped type buildings or incremental type buildings may be allowed only in respect of individual residential or educational / institutional buildings and such incremental development would be considered only after a minimum time period of 5 years.\n(f) As per the provisions of the AP Fire Service Act, 1999, commercial buildings of height 15 meters and above, and buildings of public congregation like schools, cinema theatres, function halls and other assembly buildings on plot area of 500 sq. meters and above or of height above 6 meters are required to obtain prior clearance from Fire Department from fire and life safety point of view.\n(g) The setbacks are required to be left after leaving the affected area of the plot / site, if any, for road widening. In respect of owners who surrender land affected in road widening free of cost, would be eligible for concessions in setbacks under G.O. Ms. No.15 M.A., dated 15-01-1998 and instructions issues by the Government from time to time.\n(h) Building line is from the edge of the Road Right-of-way (whether existing or proposed).\n(i) Where the lighting and ventilation of a building is through the means of a chowk or inner courtyard or interior open space/duct, such open space shall be open to sky and of area at least 9.0 sq. meters and no side shall be less than 1.5 meters in case of buildings of height up to 12 meters and in case of buildings of height above 12 meters no side shall be less than 2 meters.\n(j) A strip of at least 1.0 meters greenery/lawn along the frontage of the site within the front setback shall be compulsorily developed and maintained with greenery and trees.\n(k) For plots above 200 sq. meters, in addition to (vi) above, a minimum 1 meter wide continuous green planting strip in the periphery on remaining sides are required to be developed and maintained within the setback.\n(l) For all residential / Institutional / Industrial plots above 750 Sq. meters, in addition to (vi) and (vii) above, 5% of the site area has to be developed as tot-lot / landscaped area and trees planted and maintained. Such organised open space could be in more than one location and shall be open to sky and shall be of a minimum width of 3 meters.\n(m) To enhance the streetscape in respect of 18 meters and above roads, no front compound wall is recommended along the front setback. Only iron grill or low height green hedge and / or with sloping type planters is recommended along such roads.\n(n) In all plots 750 sq. meters and above, provision shall be made for earmarking an area of 3 meter x 3 meter for the purpose of setting of public utilities like electricity distribution transformer, etc. within the owner's site and located in a corner splay of setback subject to mandated public safety requirements, ensuring turning radius for vehicles etc.\n(o) If the above greenery mentioned at (j) to (l) above and Rule 9.10 is not maintained, 10% of additional Property tax every year would be imposed as penalty by the sanctioning authority till the condition is fulfilled.\n(p) In case of plots above 300 sq. meters and upto 750 sq. meters, it is permitted to transfer up to one meter of setback from one side to the other side, and in case of plots above 750 sq. meters, it is permitted to transfer up to 2 meters of setback, which needs to be uniform at any given point, subject to maintaining of minimum building line in the front.\n(q) In case of corner plots or plots abutting two or more roads, the front setback shall be as per the building line for the road having maximum width.\n(r) For narrow plots where the length is 4 times the width of the plot or more, the setbacks on sides may be compensated in front and rear setbacks so as to ensure that the overall aggregate setbacks are maintained in the site, subject to maintaining a minimum of 1 meter on each side.\n(s) The space between 2 blocks shall be as given in Table-V.\n(t) The height of the building will be calculated after excluding the parking floors for the purpose of computation of minimum setbacks to be left.\n(u) Where all the owners of sites along the abutting road come forward for widening of the road by undertaking preparation of a Road Development Plan which would improve circulation in the area and duly approved by the competent authority, and by leaving the area affected in the widening of such road free of cost and implement it within one year, then higher height of the corresponding widened road width would be considered for such sites.\n(v) Splay at road junctions, including Y-junctions shall be provided as follows:\n•   3.0 meters x 3.0 meters offset/splay if the width of the road is 12 meters or less;\n•   4.5 meters x 4.5 meters offset/splay if the width of the road is above 12 meters but less than 24 meters in width;\n•   6.0 meters x 6.0 meters offset/splay if the width of the road is above 24 meters;\n•   In case of road junctions of different widths, a combination of the above as the case may be shall be ensured;\n•   The area of such splay would be deemed to form part of the road junction. No compound wall or any structure shall be allowed to be constructed in the splay area.\n(ii) For the purpose of these Rules, the following conversion from M.K.S. and F.P.S. system shall be reckoned:\n(i) 3 meters= 10 ft\n(iv) 9 meters= 30 ft\n(vii) 18 meters= 60\n\t\t\t\tft\n(x) 45 meters=150 ft\n( ii) 6 meters= 20 ft\n(v) 12 meters= 40 ft\n(viii) 24 meters= 80\n\t\t\t\tft\n(xi) 60 meters= 200 ft.\n(iii) 7.5 meters= 25\n\t\t\t\tft\n(vi) 15 meters= 50 ft\n(ix) 30 meters= 100 ft\nTable - III\nTable - III\nSl No\nPlot Size (in sq\n\t\t\t\t\tmeters)\nParking provision\nHeight permissible\n\t\t\t\t\t(in meters)\nBuilding line or\n\t\t\t\t\tminimum front setback (in meters) to be left\nMinimum setbacks on\n\t\t\t\t\tremaining sides (in meters)\nAbutting road width\nUp to 12\nAbove 12 & up to\n\t\t\t\t\t18\nAbove 18 & up to\n\t\t\t\t\t24\nAbove 24 & upto\n\t\t\t\t\t30\nAbove 30\n1\n2\n3\n4\n5\n6\n7\n8\n9\n10\n1\nLess than 100\n-\n7\n1\n1\n3\n3\n3\n-\n2\n100 & upto 200\n-\n10\n1.5\n1.5\n3\n3\n3\n1.0\n3\nUpto 3 Above 200 & upto 300\nStilt Upto 7 parking floor allowed\n2\n4\n5\n6\n7.5\n1.0\nUpto 10\n3\n4\n5\n6\n7.5\n1.5\n4\nAbove 300 & upto 500\nStilt parking floor allowed\nUpto 7\n3\n4\n5\n6\n7.5\n2.0\nUpto 12\n3\n4\n5\n6\n7.5\n2.5\n5.\nAbove 500 & upto 1000\nStilt parking + One Cellar floor allowed\nUpto 7\n3\n4\n5\n6\n7.5\n3.0\nUpto 12\n3\n4\n5\n6\n7.5\n3.5\nBelow 15\n3\n4\n5\n6\n7.5\n4\n6\nAbove 1000\nStilt parking+2 Cellar floors allowed\nUpto 7\n3\n4\n5\n6\n7.5\n3.5\nUpto 12\n3\n4\n5\n6\n7.5\n4\nBelow 15\n3\n4\n5\n6\n7.5\n5\nBelow 18*\n3\n4\n5\n6\n7.5\n6\n(a) Provision of Joint Open Space in certain cases:\n(b) The building requirements and standards other than heights and setbacks specified in the National Building Code of India, 2005 shall be complied with.\n(c) Such buildings shall be undertaken by owners by engaging registered architects/licenced builders/developers and licenced structural engineers. The designs and building plans shall be countersigned by the owner, licenced developer, registered architect, licenced engineer and a qualified & licenced structural Engineer who shall be responsible for the supervision, structural safety, earthquake safety, fire safety and specifications compliance of such buildings. Buildings shall be designed for compliance with earth quake resistance and resisting other natural hazards. The Completion Certificate shall contain that the norms have been followed in the design and construction of buildings for making the buildings resistant to earthquake, compliance with structural safety and fire safety requirements.\n(d) The work of the building services like sanitation, plumbing, fire safety requirements, lifts, electrical installations, and other utility services shall be executed under the planning, design and supervision of qualified and competent technical personnel.\n(e) The parking requirements shall be complied as given in these rules. The parking facilities and vehicles driveways etc. shall be maintained to the satisfaction of the sanctioning Authority.\n(f) Shall provide solar water heating system in the building and solar lighting in the site for outdoor lighting within the site, etc. and give a bank guarantee to this effect to the sanctioning authority for compliance of the same.\n(g) All Public and semi-public buildings including Assembly Buildings/Commercial complexes and other Public Congregation Buildings with covered area above 300 sq m shall be designed and constructed to provide facilities to the physically handicapped persons as prescribed in the National Building Code of India, 2005.\n(h) In all buildings irrespective of above height provisions, the requirements of parts of the building like size and area requirements of habitable rooms, kitchen, bathrooms and Water closets, other areas, corridor and staircase widths, service ducts, etc. shall conform to the National Building Code of India,2005.\n(i) All environmental aspects like provision of Rain water harvesting structures, greenery, solar heating and area lighting systems, Andhra Pradesh Water, Land & Tree Act provisions, etc., shall be complied with in such of the sites and Schemes where these are applicable.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 5
        },
        {
            "number": "8",
            "title": "8. Encouragement For Buildings With Central Courtyards.",
            "chapter": null,
            "content": "(a) the area so saved is transferred to the central area/space or court yard;\n(b) the minimum open space on sides and rear except front, shall be\n•   1.5 meters for building height upto 12 meters;\n•   2.0 meters for building height upto 15 meters;\n•   3.0 meters for building height upto 18 meters;\n•   6.0 meters in case of high rise buildings up to 21 meters height and buildings coming under purview of AP Fire Services Act, 1999 and\n•   7 meters in respect of buildings 21 meters to 30 meters height.\nSuch high rise buildings and buildings coming under purview of AP Fire Services Act,1999 need to obtain prior clearance from the Fire Services Department;\n(c) The depth of such courtyard shall be at least 50% of the average building depth.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 6
        },
        {
            "number": "9",
            "title": "9. Requirements For High Rise Buildings.",
            "chapter": null,
            "content": "Table - IV\nTable - IV\nHeight of building( in meters)\nHeight of building( in meters)\nMinimum abutting road width required ( in\n\t\t\t\tmeters)\nMinimum abutting road width required ( in\n\t\t\t\tmeters)\nMinimum alround open space on remaining sides\n\t\t\t\t(in meters) *\nMinimum alround open space on remaining sides\n\t\t\t\t(in meters) *\n(1)\n(1)\n(2)\n(2)\n(3)\n(3)\nUp to 21\nAbove 21 & up to\n\t\t\t\t24\nAbove 24 & up to\n\t\t\t\t27\nAbove 27 & up to 30\n12\n12\n18\n18\n7\n8\n9\n10\n(i) The abutting road has to be black-topped with minimum 2-lane carriageway. Service roads where required as per these Rules shall be minimum 7 meters wide with minimum 2-lane black topped carriageway.\n(ii) For upper floors from 2nd floor onwards, the balcony projection of up to 2 meters may be allowed projecting onto the open spaces.\n(iii) The open space to be left between two blocks shall be equivalent to the open space mentioned in Column (3) of above Table IV.\n(iv) It is permitted to transfer upto two meters of setback from one side to the other side, which needs to be uniform at any given point, subject to maintaining of minimum setback of 7 meters on all sides.\n(v) Where the lighting and ventilation of a building is through the means of a chowk or inner courtyard or interior open space/duct, such open space shall be open to sky and of area at least 25 sq. meters and no side shall be less than 3 meters.\n(a) For podium, i.e., Ground plus first floor: all-round setbacks shall be 7 meters all-round\n(b) For the Tower block: The coverage and alround setbacks shall be minimum 50 % of the Podium Block, and shall be at least 3metersfrom the Podium edge on all sides,\n(c) the fire safety and fire escape measures for the Tower Block shall be independent of the Podium Block.\n(a)\nAt ground level\n:\nminimum 9 meters all round open space for the\n\t\t\t\tfirst five floors\n(b)\nAt upper floors\n:\nincrease of 3 meters all round open space or\n\t\t\t\tmore, for every 5 upper floors or 15 meters height or part\n\t\t\t\tthereof, over and above the ground level open space of minimum 9\n\t\t\t\tmt.\n(a) In every high rise building site, an organised open space which shall be utilised as greenery, tot lot or soft landscaping, etc. shall be provided over and above the mandatory open spaces to be left in and around the building.\nThis space shall be at least 10% of total site area and shall be of regular shape with a minimum width of 2 Meters. This may be in one or more pockets and shall be open to sky.\n(b) In addition to the above, a minimum 2 meter wide green planting strip in the periphery on all sides within the setbacks are required to be developed and maintained in all high rise building sites.\n(c) Rain water harvesting structures shall be provided in the prescribed manner within the setbacks.\n(i) The building requirements and standards other than heights and setbacks specified in the National Building Code, 2005 shall be complied with.\n(ii) Such buildings shall be undertaken by owners by engaging registered architect, licenced builders/developers and licenced structural engineers. The designs and building plans shall be countersigned by the owner, licenced developer, registered architect, licenced engineer and a qualified & licenced structural Engineer who shall be responsible for the supervision, structural safety, fire & life safety and specifications compliance of such buildings. Buildings shall be designed for compliance with earth quake resistance and resisting other natural hazards.\n(iii) The Completion Certificate issued by the registered architect and licenced engineer and structural engineer shall certify that the norms have been followed in the design and construction of buildings for making the buildings resistant to earthquake, compliance with structural safety, fire and life safety requirements, and that the building is constructed in accordance with the sanctioned drawings.\n(iv) The work of the building services like sanitation, plumbing, fire & life safety requirements, lifts, electrical installations, and other utility services shall be executed under the planning, design and supervision of qualified and competent technical personnel.\n(v) In addition to the required staircases and lifts, there shall be at least one fire escape staircase and lift. These lifts shall be got certified from the manufacturer's authorised Service technical personnel from time to time.\n(vi) Provision for power generator shall be made in all high-rise buildings.\n(vii) All high-rise buildings shall be planned, designed and constructed to ensure fire & life safety requirements are met and maintained and shall comply in accordance with the Fire Protection Requirements of National Building Code of India.\n(viii) The facilities for providing fire protection and fire fighting facilities in such buildings should be in compliance with the stipulations laid down and clearance issued by the Fire Department from time to time. NOC from the Fire Department shall be obtained from time to time regarding the fire safety requirements , equipment and facilities installed. The designs and installations regarding fire protection and safety measures including exit requirements and smoke containment and smoke management measures shall be undertaken through a fire engineer/ fire consultant.\n(ix) The parking requirements shall comply as given in these rules. The parking facilities and vehicles driveways etc. shall be maintained to the satisfaction of the sanctioning Authority.\n(x) All high-rise buildings shall be provided with solar water heating system in the building and solar lighting in the site for outdoor lighting, etc. and give a bank guarantee to this effect to the sanctioning authority for compliance of the same.\n(xi) All high-rise public and semi-public buildings/ Assembly buildings/ Commercial complexes and such other public congregation buildings shall be designed and constructed to provide facilities to the physically handicapped persons and elderly persons as prescribed in the National Building Code of India,2005.\n(xii) In all high rise buildings, the requirements of parts of the building like size and area requirements of habitable rooms, kitchen, bathrooms and Water closets, corridor and staircase widths, service ducts, and other areas shall be designed and conform to the provisions of the National Building Code of India.\n(xiii) All environmental aspects like provision of Rain water harvesting structures, greenery, solar heating and area lighting systems, Andhra Pradesh Water, Land and Tree Act provisions, etc., shall be complied with.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 7
        },
        {
            "number": "10",
            "title": "10. Requirements of Group Development, Group Housing/ Cluster Housing/ Residential Enclaves And Row Housing Schemes.",
            "chapter": null,
            "content": "(i) A Services and Utilities Plan as per standards for provision of water supply system, drainage and storm water disposal system, sewerage system , rain water harvesting structures, and for other utilities.\n(ii) A landscaping plan including rain water harvesting/ water recycling details.\n(iii) Parking & internal Circulation Plan along with Common pool parking area plan, if any.\nTable - V\nTable - V\nHeight of building block(in meters)\nHeight of building block(in meters)\nDistance to be maintained from periphery to\n\t\t\t\tbuilding block (in meters)\nDistance to be maintained from periphery to\n\t\t\t\tbuilding block (in meters)\nDistance between two blocks (in meters)\nDistance between two blocks (in meters)\nUp to 10 mtrs.\nAbove 10 mtrs. &\n\t\t\t\tup to 15 mtrs.\n15 mtrs. & below\n18 mtrs. 18 and Above\n3\n4\n6\n2\n3\n6\nAs per alround setbacks required under High-rise\n\t\t\t\tbuildings given in Table IV\n(a) (i) Stilt floor permissible and is exclusive of height of building up to 15 meter Height of stilt floor shall not exceed 3.0 meters.\n(ii) Where cellars are permissible these are excluded from height of Building.\n(iii) No Balcony projection shall be allowed to extend onto the minimum distances to be maintained & other open spaces.\n(b) Common amenities and facilities like shopping center, community hall or center / club house etc. are required to be provided in up to 5 % of the total built up area and shall be planned and are required to be developed in cases where the units are above 100 in number and not be part of the residential blocks.\n(c) A through public access road of 9 meters width with 2-lane black-topped is to be developed on any one side at the periphery/ as per suitability and feasibility for the convenience of accessibility of other sites and lands located in the interior. This may not be necessary in case where a peripheral road of minimum 9 meters width already exists.\n(d) In case of blocks up to 12 meters height, access through pathways of 6 meter width branching out from the internal roads/loop road would be allowed. All internal roads and pathways shall be developed as per standards.\n(e) Minimum of 10 % of total site area shall be earmarked for organised open space and be utilised as greenery, tot lot or soft landscaping, etc. and shall be provided over and above the mandatory open spaces. This may be in one or more pockets and shall be open to sky.\n(f) All the roads and open spaces mentioned in various schemes in Rule 10 shall be handed over to the local authority at free of cost through a registered gift deed before the issue of Occupancy Certificate. The local authority may in turn enter in to an agreement with the Society/ Association for utilizing, managing and maintaining the roads and open spaces. In case of any violation or encroachment, the local authority has the power to summarily demolish the encroachments and resume the roads and open spaces and keep it under it's custody.\n(a) Minimum site area : 1000 sq m\n(b) Minimum size of individual plots for row houses / Row shops: 50 sq m.\nNot more than 8 plots shall be developed in a row.\nSeparation between two blocks shall not be less than 6 mt, which may be an open space or an alley/pedestrian plaza.\nOnly internal staircase would be allowed.\n(c) Minimum width of internal roads: 9 m ;\nInternal cul-de-sac road 6m with max. length 50 metersis allowed\n(d) Minimum open space : 10 % of site area\n(e) Height permissible: 2 floors or 6 m for plots up to 125 sq m\nStilt + 2 floors for plots above 125 sq m for row houses\n(f) Minimum setbacks: Front 3m ; Rear 1.5 m\nThe setbacks in a row can be interchangeable.\nIn case of row type shopping precincts, back to back shops with above front setback of 3m would be allowed.\n(g) In case of very large projects, i.e., more than 5 acres, additional common amenities and facilities like shopping center, community hall/club house etc. are required to be provided in 5 % of the area.\n(h) In case of Row Type Shopping Precincts, common basement parking in one or more levels would be permissible subject to conditions mentioned in Rule (11).\n(a) Minimum site area: 1000 sq m\n(b) Minimum plot size for cluster house: 25 sq m with maximum number of 20 houses in a cluster\n(c) Minimum size of cluster open space: 36 sq m with a minimum width of 6m\n(d) Height permissible: 2 floors or 6 m\n(e) Minimum access road to the Cluster Housing Complex: 9 m\n(f) Internal access may be through pedestrian paths of 6 m\n(g) Minimum space between two clusters: 6m which may be utilised as pathway/alley\n(h) Building setbacks: No setbacks are needed for interior clusters as the lighting and ventilation is either from the central open space of cluster and the surrounding pedestrian pathway/ access road of the cluster. However, interior courtyards may be provided for larger plots and building areas to facilitate lighting and ventilation. For end clusters sides that are abutting peripheral thoroughfare roads, setback shall be as per the Building line given in Table-III.\n(a) These would be allowed as gated developments that are exclusive housing areas with common compound wall with access control through gates and having their own facilities and amenities. The housing units may comprise of row houses, semi-detached, detached or Apartment blocks or a mix or combination of the above. The building requirements would be as per the given type of housing.\n(b) Residential enclaves would be permitted only in those sites that give through access of minimum 9 m peripheral road for the neighbouring plots or lands that are located in the interior. They would be governed by good design standards and not impinging on the overall accessibility and circulation network of the area.\n(c) Minimum size of site: 4000 sq mt.\n(d) Size of plots and height permissible: as per type of housing and requirements as given above for the respective type of housing.\n(e) Minimum Common Open space : 10 % of site area.\n(f) Building setbacks: As per type of housing & requirements given above for the said type of housing and as per Table III.\n(g) Internal Road requirements:\n•   9.0 to 18 m for main internal approach roads;\n•   9 m for other internal roads and\n•   8 m for cul-de-sacs roads between 50-100 m length\n•   9 m for looped roads",
            "footnote": "",
            "is_definition": false,
            "sort_order": 8
        },
        {
            "number": "11",
            "title": "11. Parking Requirements.",
            "chapter": null,
            "content": "Table - VI\nTable - VI\nCategory of building/activity\nCategory of building/activity\nParking area to be provided as percentage of\n\t\t\t\ttotal built up area\nParking area to be provided as percentage of\n\t\t\t\ttotal built up area\nSpecial Grade /Selection Grade Municipalities\nSpecial Grade /Selection Grade Municipalities\nOther Municipalities\nOther Municipalities\nShopping Malls*,\n\t\t\t\tInformation Technology Enabling Services Complexes\nHotels, restaurants,\n\t\t\t\tlodges, Cinema halls, business buildings, other commercial\n\t\t\t\tbuildings, Kalyana Mandapams, Offices, & Non Residential\n\t\t\t\tHigh-rise Buildings /Complexes\nResidential Apartment Complexes including\n\t\t\t\tHigh-rise Buildings. Hospitals, Institutional buildings,\n\t\t\t\tIndustrial buildings, Schools, Colleges and other educational\n\t\t\t\tbuildings, Godowns & Other uses.\n30 %\n25%\n20%\n25 %\n20%\n20%\n*Parking and other requirements in case of Multiplex Complexes shall be governed by the provisions of Multiplex Rules\n(i) In basements or cellars allowed upto 3.25 meter., in one or two level and such cellars shall be allowed for plots 750 sq m and above; or\n(ii) On stilt floor or in upper parking floors (at any level) - the height of such parking floors shall be allowed upto 2.75 meter height;\n(iii) in the open space over / setbacks (except the front setback) to be left around the building with adequate vehicular access, aisle, drives, ramps required for maneuvering of vehicles; or\n(iv) Common pool parking area (in the case of Group Housing Scheme/Residential enclave/Cluster housing/Row housing schemes); or\n(v) Combination of any or all the above;\n(vi) In case of non-residential occupancies on sites below 750 sq. meters for parking a semi-basement of 3 meter height and with such height not exceeding 1.5 meter above ground level may be considered.\n(i) Common and Continuous cellar parking floors between adjoining buildings would be allowed depending upon structural safety aspects, mutual agreement between owners, etc.\n(ii) The parking spaces should be efficiently designed and clearly marked and provided with adequate access, aisle, drives and ramps required for maneuvering of vehicles.\n(iii) Stilt floor /Cellar parking floor shall be used only for parking and not for any habitation purpose. Misuse of the area specified for parking of vehicles for any other use shall be summarily demolished / removed by the Enforcement Authority.\n(iv) For parking spaces in basements and upper storeys of parking floors, at least two ramps of minimum 3.6 meters width or one ramp of minimum 5.4 meters width and adequate slope shall be provided. Such ramps may be permitted in the side and rear setbacks after leaving sufficient space for movement of fire-fighting vehicles. Access to these may also be accomplished through provisions of mechanical lifts.\n(v) Basement/cellar shall be set back at least 1.5 meters from the property line and in case of more than one cellar 1 meter additional setback for every additional cellar floor shall be insisted.\n(vi) Up to 10% of cellar may be utilized for utilities and non-habitation purpose like A/C Plant room, Generator room, STP, Electrical installations, Laundry, etc,\n(vii) Space over and above 6 meter in front setback may be considered as off-street parking space.\n(viii) Visitors parking to be provided shall be 10 % of the area mentioned in Table VI, and may be accommodated in the mandatory setbacks other than the front setback, wherever such setbacks are more than 6 meters.The Visitors Parking facility shall be open to all visitors.\n(ix) In respect of Apartment Complexes / Building / Block, in sites up to 750 sq. meters. The Parking requirement shall be deemed to be met if the entire stilt floor is left for parking.\n(x) A WC / Toilet facility shall be provided for watch and ward in the stilt floor.\n(a) equivalent built up area of such Parking Complex / or area of Parking lot as the case may be would be considered as Transferable Development right by the sanctioning authority.\n(b) In an existing area/locality where an owner or two or more owners come together and develop combined or common parking Complex, pedestrian plaza/ subway, or improve/facilitate additional access by linking with surrounding roads etc for public usage are provided, as part of their premises / land development/improving the urban design aspects, additional bonus built up area/TDR would be considered by the sanctioning authority.\n(c) The setbacks for Parking Complexes shall be as follows:\nfront - as per building line setbacks on remaining sides - 50% of setbacks given in Table III\n(d) No fees and other charges shall be charged by the Sanctioning Authority for the area/floors developed as Parking Complex / Parking lot;\n(e) A moratorium on property tax for 5 years would be considered;\n(f) For the next 5 years - Property tax shall be levied on the lowest slab of residential category.\n(g) Such parking complexes may be permitted along or off main commercial roads, city center, near public congregation buildings/places, close to Bus stations, Railway Stations and any public transport system so as to encourage use of public transport, etc. Access to these parking spaces in such Complexes may be accomplished through provision of mechanical lifts. Such areas may be identified by the sanctioning authority and notified to public every year by 1st April.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 9
        },
        {
            "number": "12",
            "title": "12. Restrictions on Projections Allowed in Mandatory Open Spaces.",
            "chapter": null,
            "content": "(i) No balcony projections or corridor shall be permitted beyond the setbacks i.e., projecting within the mandatory open spaces in case of non-high rise buildings. These, if provided for, shall be set back as per the minimum mandatory open spaces and the setback shall be clear from the edge of the balcony or corridor.\n(ii) Cornice, Chajjas / weather shades only of width not exceeding 60cm shall be allowed in the mandatory setbacks.\n(iii) In case of plots more than 300 sq m:\na. Sump, septic tank, well and a servant quarter may be allowed in the rear and side open spaces. These shall need to be setback at least 1.5 m from the property or boundary line of the plot.\nb. Parking sheds, generator room may be allowed in the rear and side open spaces.\nc. In the front setback only a security guard booth of 2 sq.mt may be allowed.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 10
        },
        {
            "number": "13",
            "title": "13. Technical Clearance From Competent Authority.",
            "chapter": null,
            "content": "(a) Municipal Commissioner - Member\n(b) Regional Deputy Director of Town Planning - Member\n(c) Superintending Engineer, Public Health Dept. - Member\n(d) A Senior practicing Architect (to be nominated by DTCP) - Member\n(e) City Planner/Town Planning Officer of local body --Member-Convener",
            "footnote": "",
            "is_definition": false,
            "sort_order": 11
        },
        {
            "number": "14",
            "title": "14. Urban Design and Architectural Control.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 12
        },
        {
            "number": "15",
            "title": "15. Obligations of the Owner and Licenced Developer/builder / Licenced Technical Personnel to Implement and Develop the Master Plan/statutory Plan Circulation Network and Specific Land Uses.",
            "chapter": null,
            "content": "Or\nOr",
            "footnote": "",
            "is_definition": false,
            "sort_order": 13
        },
        {
            "number": "16",
            "title": "16. Grant of Transferable Development Right.",
            "chapter": null,
            "content": "(a) For the Master Plan road network undertaken and developed: equivalent to 100% of built up area of such area surrendered.\n(b) For conservation and development of lakes / water bodies / nalas foreshores & Recreational buffer development with greenery, etc: equivalent to 50 % of built up area of such recreational buffer area developed at his cost.\n(c) For Heritage buildings and heritage precincts maintained with adaptive reuse, equivalent to 50 % of built up area of such site area.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 14
        },
        {
            "number": "17",
            "title": "17. Levy of Special Fees and Other Provisions For Certain Areas.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 15
        },
        {
            "number": "18",
            "title": "18. Town Level Infrastructure Impact Fees Applicable in Certain Cases.",
            "chapter": null,
            "content": "Type I : Buildings up to height 15 m excluding stilt parking floor\nType II : Buildings of height above 15 m (excluding stilt floor)\n•   First 15 m or 5 floors (whichever is less): No levy of Impact fee\n•   For any additional floors or part thereof: at differential rates specified in Table below:\nTable - VII\nTable - VII\nOccupancy /Use\nHeight of Building (in meters) and rate in Rs.\n\t\t\t\tper sq m of built up area\nAbove 15 m & up to 21 m\nAbove 21 m & up to 30 m\nSelection/Special/1st Grade Municipalities\n2nd /3rd Grade Municipalities/Nagar panchayaths\nSelection/Special/1st Grade Municipalities\n2nd /3rd Grade Municipalities/Nagarpanchayaths\nResidential\n\t\t\t\tCommercial, Offices, ITES\nInstitutional, educational & Others (except\n\t\t\t\tIndustrial sheds)\n150\n300\n100\n100\n200\n75\n250\n400\n200\n200\n300\n150\nHeight of Building (in meters) and rate in Rs.\n\t\t\t\tper sq m of built up area\nAbove 30 m & up to 40 m\nAbove 40 m\nSelection/Special/1st Grade Municipalities\n2 nd /3 rd Grade\n\t\t\t\tMunicipalities/Nagarp anchayaths\nSelection/Special/1st Grade Municipalities\n2 nd /3 rd Grade\n\t\t\t\tMunicipalities Nagarpanchayaths\n400\n600\n300\n300\n400\n200\n800\n1200\n800\n500\n800\n500\n•   In case of Multiplexes, instead of the above, the rates given in the Multiplex Rules shall be applicable.\n(1) Alternatively, the owner may be allowed to utilize TDR given in Rule 15 above, for such built up area to the extent permissible wholly or use the same in combination of both TDR and the differential impact fee for the proposed additional built up area that is permissible under these Rules / Provisions.\n(2) The Government may revise the above rates from time to time.\n(3) The above rates shall not be applicable for Schemes/ buildings of Government Departments and public agencies like, APIIC and local bodies.\n(4) The amount levied and collected under above Rule shall be credited and maintained in a separate escrow account by the concerned sanctioning authority and 50% of such funds shall be utilised for development of infrastructure in the same area and balance shall be utilised towards improvement of town level critical infrastructure in the area. An Infrastructure Plan and Action Plan for implementation is required to be undertaken by the sanctioning authority and the said fund shall be utilised accordingly.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 16
        },
        {
            "number": "19",
            "title": "19. Incentives For Owners Leaving More Setbacks / Installing Solar Heating System / Lighting / Rain Water Harvesting / Recycling of Waste Water.",
            "chapter": null,
            "content": "(a) Construct the building /blocks by leaving more setbacks than the minimal stipulated in these Rules, viz.,:\nLeaving 1.5 times the minimum setbacks in all sides: 10% rebate*\nLeaving 2.0 times and above than the minimum setbacks on all sides: 20 % rebate*\n* The setbacks have to be on all sides to qualify for the rebate. Leaving more on one side and the minimum on other sides would not qualify for such rebate.\n(b) Install and use solar heating and lighting system: 10% rebate.\n(c) Undertake the recycling of waste water, rain water harvesting structures and plantation of trees and greenery: 10% rebate\n(d) Where owners provide at least 25% additional parking space over and above the minimum specified in Rule 11, they would be allowed for a rebate of 10% in property tax.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 17
        },
        {
            "number": "20",
            "title": "20. Building Permit/license Fees & Undertaking.",
            "chapter": null,
            "content": "(b) No fees and charges would be levied for parking spaces provided in stilt/cellar or any other parking floors.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 18
        },
        {
            "number": "21",
            "title": "21. Compliance by Owner for Ensuring that Construction is Undertaken as per Sanctioned Plan.",
            "chapter": null,
            "content": "(b) Before the release of the building sanction by the sanctioning authority, the owner of the plot/site is not only required to produce the original registered Sale Deed, and also required to demarcate the setbacks and open spaces on the site. The original sale deed is required for the perusal of the sanctioning authority and cross verification with the attested copy submitted with the building application.\n(c) The owner is required to hand over the ground floor area or first floor or the second floor area, as the case may be, or 10% of the total built-up area, whichever is less, to the sanctioning authority by way of a Notarised Affidavit and after the setbacks and open spaces are demarcated on the site. The Notarised Affidavit shall be got entered by the sanctioning authority in the Prohibitory Property Watch Register of the Registration Department. Only after compliance of the above and (b), the Building sanction will be released by the sanctioning authority and the owner shall be allowed to commence the construction.\n(d) In respect of gated development schemes like row houses / independent houses / cluster housing / residential enclaves, instead of the condition at c) above, 5% of the built units shall be handed over to sanctioning authority by way of a Notarised Affidavit.\n(e) Individual residential buildings in plots upto 500 sq.meters with height upto 7 Mts, and industrial buildings are exempted from the above condition.\n(f) The system of taking a Security Deposit is dispensed with.\n(g) The built up area handed over to the sanctioning authority at c) and d) shall be relinquished along with the issue of occupancy certificate.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 19
        },
        {
            "number": "22",
            "title": "22. Occupancy Certificate.",
            "chapter": null,
            "content": "(ii) The owner shall submit a notice of completion through the registered architect and licenced builder/developer along with prescribed documents and plans to the Sanctioning Authority. The Sanctioning Authority on receipt of such notice of completion shall undertake inspection with regard to the following aspects:\n(a) Number of floors\n(b) External setbacks\n(c) Parking space provision\n(d) Abutting road width and shall communicate the approval or refusal of the Occupancy Certificate within 15 days or may issue the same after levying and collecting compounding fee, if any, as follows:\n(iii) The sanctioning authority is empowered to compound the offence in relation to setbacks violations (other than the front setback) upto 10%, duly recording thereon the deviations in writing. This provision is made to take care of unintentional and minor violations in setbacks by the individual plot owners. The rate of Compounding fee shall be a minimum rate of Rs.500 per sq mt, and the Government may revise this rate from time to time. Compounding of such violation shall not be considered for buildings constructed without obtaining any sanctioned plan. These fees shall be maintained in a separate escrow account and utilised towards improvement of the roads and public open spaces development in the area.\n(iv) For all high rise buildings, the work shall be subject to inspection by the Fire service Department and the Occupancy Certificate shall be issued only after clearance from the Fire Services Department with regard to Fire Safety and Protection requirements.\n(v) The functional/line agencies dealing with electric power, water supply, drainage and sewerage shall not give regular connections to the building unless such Occupancy Certificate is produced, or alternatively may charge 3 times the rate till such time Occupation Certificate is produced. This condition shall also be applicable to all unauthorized constructions and buildings constructed without sanctioned building plan. In addition to the above, the local body shall collect every year two times the property tax as penalty from the owner/occupier till such time the Occupation Certificate obtained.\n(vi) The Registration Authority shall register only the permitted built up area as per the sanctioned building plan and only upon producing and filing a copy of such sanctioned building plan. On the Registration Document it should be clearly mentioned that the registration is in accordance with the sanctioned building plan in respect of setbacks and number of floors.\n(vii) The financial agencies/institutions shall extend loan facilities only to the permitted built up area as per the sanctioned building plan.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 20
        },
        {
            "number": "23",
            "title": "23. Enforcement.",
            "chapter": null,
            "content": "(i) The Licenced Technical Personnel to whom the Licence has been accorded by the Local Bodies concerned for practicing as Licenced Technical Personnel are wholly and severally held responsible for any deviations made to the sanctioned plans, since the licence accorded to them includes supervision of the work in accordance with the sanctioned plan and they should cooperate with the field staff during the inspections and removal of the deviations if any noticed and if found any breach of this rule the concerned Licenced Technical personnel shall be prosecuted besides black-listing and debarring them from practicing in the entire State for 5 years and cancellation of their licence.\n(ii) The Enforcement authority shall summarily remove any violation or deviation in building construction in maintaining the road widths and building line.\n(B) Constitution of Town Planning and Building Tribunal - The Government shall constitute a Town Planning and Building Tribunal for dealing with all town planning, enforcement and building issues by making necessary amendment to the AP Municipalities Act,1965.\n(C) Constitution of Building Ombudsman - The Government may constitute a Building Ombudsman for dealing with all complaints of building violations, shortfall in building standards, services and specifications and safety aspects. The Government shall separately work out the procedure, role and details of the functioning of the Building Ombudsman.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 21
        },
        {
            "number": "24",
            "title": "24. Limitations of Building Sanction.",
            "chapter": null,
            "content": "(i) Title or ownership of the site or building\n(ii) Easement Rights\n(iii) Variation in area from recorded areas of plot or a building or on ground\n(iv) Structural Reports, Structural Drawings and structural aspects\n(v) Workmanship, soundness of structure and materials used,\n(vi) Quality of building services and amenities in the construction of building\n(vii) The site/area liable to flooding as a result of not taking proper drainage arrangements as per natural lay of the land, etc.\n(viii) Other requirements or licences or clearances required for the site/ premises or activity under various other laws.\n(ix) The permission accorded is valid for construction for a period of three years provided the commencement of work shall be made within one year from the Date of Permission duly giving commencement of work Notice, failing which the permission accorded will be deemed to have lapsed.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 22
        },
        {
            "number": "25",
            "title": "25. Licensing of Real Estate Companies, Developers, Builders, Town Planners, Engineers & Other Technical Personnel Mandatory.",
            "chapter": null,
            "content": "(b) The engaging of the services of a licenced developer/builder shall be mandatory for Apartment Buildings, Group Housing Schemes, all types of gated developments mentioned in Rule 10, all High-Rise Buildings, and all commercial complexes.\n(c) Any developer/builder undertaking development or any firm carrying out property business in any Municipality or soliciting property sale/transactions or advertising as such in case of above, shall necessarily mention the details of their licence number, licence number of the licenced developer to whom the approval is given by the said Municipality, together with the permit number and it's validity for information and verification of public/prospective buyers.\n(d) Absence of the above at c) or suppressing of the above facts or in the case of other licences and other technical personnel who violate the conditions would invite penal action including debarring of the real estate firm/development firm / company from practice in the entire State for 5 years besides cancellation of their licence and prosecution under the relevant laws / code of conduct by the sanctioning authority.\n(e) Any licenced developer / builder / other technical personnel who undertakes construction in violation of the sanctioned plans would be liable for cancellation of their licence besides facing prosecuted under the relevant laws / code of conduct.\n(f) The format for application forms for licencing of developers / builders, real estate firms, town planners, architects, engineers, other personnel, and other conditions shall be as prescribed by the Competent Authority.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 23
        }
    ],
    "metadata": {
        "Act ID": "Last Updated 30th August, 2019 [ap455]",
        "Act Number": "Published vide Notification No. G.O.Ms. No. 569, M.A. & U.D. (M1) Department, dated 23.8.2008",
        "Enactment Date": "",
        "Act Year": "2008",
        "Short Title": "Andhra Pradesh Municipalities Development Control Rules, 2008",
        "Type": "STATE",
        "Location": "Andhra Pradesh"
    },
    "updated_at": "2026-09-29 21:55:18"
}